Sunday, May 10, 2009

Wednesday April 29 2009



Wednesday April 29 2009
Most of the soffett is done. There is still a section on the North side that needs to be done but the handrails on the roof are in the way and the trees make it difficult to move around back there. This area is close to the neighbors property and there is a bid ditch that we dug for the drainage pipe as well. Adrian dug the ditch with the excavator and then other people laid the pipe. Once that was finished, Sarah and I got dirt ready to fill back in the area with the shark wheelbarrow thing. This took forever because there is not much room back there so we could only do one load at a time and then safely back the shark up hopefully wihtout getting stuck. Luckily we finished the job today. Adrian said we will have to dig out the area right next to the footing so that we can prime and finished the waterproofing membrance on this side.