Today Megan and I were assigned to clear the water from the exterior of the North side of the building. This is so that we can figure out how deep we need to dig for the piping that will be used by Duke Energy. We figured out that we need to dig at least another foot down along the whole North side of the building. The mud was so thick though and it was close to impossible to get all teh digging done. We did the best we could as far as clearing the water but we need the ground to dry up a bit more so it will be easier to shovel. Although it is supposed to rain for the next few weeks so this may all be pointless to have started today.
We continued on shoveling gravel.
No comments:
Post a Comment