
Today we pumped water from the front (east side) of the building. This was done so that we could put more solid dirt in the small gully that sounds the exterior side of the footing. We also had a lot more shoveling of gravel, as well as using the sharks to get more gravel all around the interior of the building. We used the Transient to help us level out the gravel that we shoveled in the front room. The day was cut short because we had some pretty crazy rain around 4:30.
No comments:
Post a Comment